WHS & Compliance — All Service Abseil
Brisbane CBD — Steel Structure NDT · #JB-2244 · Urban / CBD · Near Rail Corridor · Working at Height · Rope Access · NDT / Testing
Select Job
Kirra Headland — Cliff Face Stabilisation
#JB-2241 · Coastal · Public area · IRATA L3
Surfers Paradise Tower — Facade Inspection
#JB-2238 · High rise · Occupied building · IRATA L2
Brisbane CBD — Steel Structure NDT
#JB-2244 · Urban · Working near rail corridor · IRATA L3
🚨
RAIL CORRIDOR — Queensland Rail Induction Mandatory
Work site is within 10m of Queensland Rail corridor. ALL personnel must complete Queensland Rail Network Access induction before entering site. This is a legal requirement under the Transport Infrastructure Act 1994. Contact QR Network Access: 13 16 17.
⚠️
Electromagnetic Fields — NDT Equipment
NDT ultrasonic equipment in use. Keep minimum 2m clearance from pacemaker wearers. Jake Turner (pacemaker) must not operate NDT equipment or enter active scan zones. See crew special notes.
🌍
Work Environment
Auto-detected from job type and location
🏙️ Urban / CBD
🚉 Near Rail Corridor
⬆️ Working at Height
🪢 Rope Access
🔍 NDT / Testing
⚡ WHS requirements below are automatically loaded based on these environment tags. Add or remove environment tags when creating or editing a job.
🦺
WHS Requirements
Site-specific obligations for this job environment
MANDATORY Legal requirement
RECOMMENDED Best practice
CONDITIONAL Situation dependent
🚉
Queensland Rail Network Induction
Mandatory for all crew before site entry. Contact QR Network Access on 13 16 17 to book. Induction takes approx 4 hours. Valid for 3 years. Must carry card on site at all times.
MANDATORY
Safe Approach Distance — Rail
Minimum safe approach distance from live rail corridor: 3m uncontrolled, 1.5m with QR-approved safeworking. No work to commence within these distances without written QR authority.
MANDATORY
🦺
High Visibility Clothing — Rail Standard
Class 3 hi-vis vest or jacket required within rail corridor. Standard construction hi-vis is not sufficient. QR-compliant hi-vis must be worn by all personnel at all times on site.
MANDATORY
🔍
NDT Equipment Safety
Ultrasonic thickness gauge in use. Equipment produces no ionising radiation but generates EMF. Do not allow personnel with pacemakers to operate equipment or enter active scan zones. See crew medical notes.
MANDATORY
🏙️
CBD Site Access & Traffic Management
Site is adjacent to public footpath. Traffic Management Plan lodged with Brisbane City Council ref: BCC-2244. Barriers and signage to be maintained throughout works. No equipment to block pedestrian access.
MANDATORY
📋
Site Induction — BCC Requirements
Brisbane City Council site induction required for all crew. Contact BCC Infrastructure (07) 3403 8888. Permit reference: BCC-2244. Site supervisor to hold copy of permit on site.
MANDATORY
🌡️
Urban Heat — CBD Environment
CBD canyon effect increases ambient temperature. Heat management plan required for summer months. Water, shade breaks and heat monitoring to be included in pre-start.
RECOMMENDED
⚖️
Legislation & Standards
Applicable acts, regulations and Australian Standards
Work Health and Safety Act 2011 (QLD)
QLD WHS Act 2011
Transport Infrastructure Act 1994 (QLD) — Rail Corridor
TIA 1994 Part 5
Queensland Rail Network Access Rules
QR NAR 2022
AS/NZS 4488 — Industrial Rope Access Systems
AS/NZS 4488:1997
AS 3788 — Pressure Equipment — In-service Inspection
AS 3788:2006
Brisbane City Council Works Permit
Permit BCC-2244
Compliance Score
61%
SWMS completed & signed ⚠ Not done
QR Rail induction complete ⚠ Required
BCC site permit active
IRATA certs current
Traffic management plan
NDT equipment calibrated
EMF risk assessment done ⚠ Required
📋
Site Induction Log
Who has been inducted on this site
SC
Sean Chapman
QR Network Access — not yet completed
Pending
🚨
Emergency Procedures
Site-specific contacts & muster points
🏥
Nearest Hospital
Royal Brisbane and Women's Hospital — 2.8km · (07) 3646 8111
📍
Muster Point
Corner Ann & Edward St — Assembly Point marked on permit
🚒
Emergency Services
000
☠️
Poisons Information
13 11 26
👷
Site Supervisor
Sean Chapman — 0412 345 678
🏢
Client Contact
BCC Infrastructure — (07) 3403 8888