Kirra Headland — Cliff Face Stabilisation
8 photos · 2 videos
Cliff face anchor installation — top section
Site overview from rope — southern face
Rigging setup — main anchor point
Anchor load test — 21 Mar 2026
Resin anchor bolts installed — section 3
Rock instability identified — marked for netting
Sea swell conditions — site assessment
🎥
▶ VIDEO
End of day site overview video
Exclusion zone signage installed
Initial face inspection — loose material noted
Surfers Paradise Tower — Facade Inspection
7 photos · 2 videos
🏢
📷
Level 18 facade — spalling concrete identified
🔍
📷
Close up — crack measurement level 18
🎥
▶ VIDEO
NDT scan — level 14 north face
🏗️
📷
Rope anchor setup — roof anchor point
📐
📷
Measurement grid on facade — level 12
🪟
📷
Window seal deterioration — levels 10-12
🎥
▶ VIDEO
Full facade pan — north elevation
🏢
📷
Concrete spalling marked — 14 locations
🔩
📷
Anchor system check — roof level
Brisbane CBD — Steel Structure NDT
2 photos · 1 videos
🏗️
📷
Site access setup — day 1
⚙️
📷
Steel connection inspection — grid C4
🎥
▶ VIDEO
NDT equipment setup and calibration