Photos & Videos — All Service Abseil
17 photos · 5 videos · 3 jobs
47
Photos This Month
6
Videos This Month
3
Active Jobs
53
Total This Month
Kirra Headland — Cliff Face Stabilisation
#JB-2241 · 10 files
8 photos · 2 videos
🔍
📷
Cliff face anchor installation — top section
Sean 21/03/2026
🔍
📷
Site overview from rope — southern face
Sean 21/03/2026
🔍
📷
Rigging setup — main anchor point
Jake 21/03/2026
▶️
▶ VIDEO
Anchor load test — 21 Mar 2026
Sean 21/03/2026
🔍
📷
Resin anchor bolts installed — section 3
Jake 20/03/2026
🔍
📷
Rock instability identified — marked for netting
Sean 20/03/2026
🔍
📷
Sea swell conditions — site assessment
Sean 19/03/2026
🎥
▶️
▶ VIDEO
End of day site overview video
Sean 19/03/2026
🔍
📷
Exclusion zone signage installed
Jake 18/03/2026
🔍
📷
Initial face inspection — loose material noted
Sean 10/03/2026
Surfers Paradise Tower — Facade Inspection
#JB-2238 · 9 files
7 photos · 2 videos
🏢
🔍
📷
Level 18 facade — spalling concrete identified
Sam 20/03/2026
🔍
🔍
📷
Close up — crack measurement level 18
Sam 20/03/2026
🎥
▶️
▶ VIDEO
NDT scan — level 14 north face
Sam 19/03/2026
🏗️
🔍
📷
Rope anchor setup — roof anchor point
Sam 19/03/2026
📐
🔍
📷
Measurement grid on facade — level 12
Sam 18/03/2026
🪟
🔍
📷
Window seal deterioration — levels 10-12
Sam 17/03/2026
🎥
▶️
▶ VIDEO
Full facade pan — north elevation
Sam 16/03/2026
🏢
🔍
📷
Concrete spalling marked — 14 locations
Sam 15/03/2026
🔩
🔍
📷
Anchor system check — roof level
Sam 14/03/2026
Brisbane CBD — Steel Structure NDT
#JB-2244 · 3 files
2 photos · 1 videos
🏗️
🔍
📷
Site access setup — day 1
Sean 25/03/2026
⚙️
🔍
📷
Steel connection inspection — grid C4
Sean 25/03/2026
🎥
▶️
▶ VIDEO
NDT equipment setup and calibration
Sean 25/03/2026