Pre-Start Check
1
Job
Details
2
Site
Conditions
3
Crew
Check
4
Safety
Checklist
5
Report
Generated
Kirra Headland — Cliff Face Stabilisation
Job #JB-2241 · Kirra Headland, Gold Coast QLD · IRATA Level 3
Auto-filled ✓
📋
Job Details — auto-filled from job card
🌤️
Weather & Site Conditions
☀️
Clear / Sunny
Partly Cloudy
🌧️
Rain / Wet
💨
High Winds
🌡️
Extreme Heat
⛈️
Storm / Lightning
🌊
High Swell
🌫️
Fog / Low Vis
⚠️ Caution conditions selected. Confirm with supervisor that site conditions are within acceptable thresholds before commencing rope access work. Document any risk mitigation applied.
🚫 Work may need to be suspended. Storm / lightning conditions require immediate suspension of all rope access operations. Contact supervisor before proceeding.
Tap to describe site conditions
👷
Crew on Site Today
Name IRATA Level Fit for Duty? PPE Inspected? Signature
⚠️ Any crew member marked not fit for duty must be stood down before work begins. Any PPE not inspected — work does not start.
Pre-Start Safety Checklist

Answer each item. Any NO must be actioned before work commences.

SWMS sighted, signed and briefed to all crew?
Must be current and site-specific
Anchors inspected, load-tested and signed off by L3 supervisor?
Two independent anchors — both checked
All ropes, PPE and hardware inspected — no damage?
Harnesses, connectors, descenders, ascenders
Exclusion zone established and rescue kit staged?
Rescue accessible within 3 min of any worker on rope
All tools on lanyards and comms tested across work area?
Radio or visual signals confirmed working
All crew fit for duty — not fatigued, unwell or impaired?
Anyone not fit must be stood down before work starts
Site conditions within acceptable thresholds per SWMS?
Wind, swell, weather — all within pre-agreed limits
📝
Additional Notes / Actions Required
Sign Pre-Start
Draw your signature below using your finger or stylus