⚠️ Caution conditions selected. Confirm with supervisor that site conditions are within acceptable thresholds before commencing rope access work. Document any risk mitigation applied.
🚫 Work may need to be suspended. Storm / lightning conditions require immediate suspension of all rope access operations. Contact supervisor before proceeding.
Tap to describe site conditions
👷
Crew on Site Today
Name
IRATA Level
Fit for Duty?
PPE Inspected?
Signature
⚠️ Any crew member marked not fit for duty must be stood down before work begins. Any PPE not inspected — work does not start.
✅
Pre-Start Safety Checklist
Answer each item. Any NO must be actioned before work commences.
SWMS sighted, signed and briefed to all crew?
Must be current and site-specific
Anchors inspected, load-tested and signed off by L3 supervisor?
Two independent anchors — both checked
All ropes, PPE and hardware inspected — no damage?
Harnesses, connectors, descenders, ascenders
Exclusion zone established and rescue kit staged?
Rescue accessible within 3 min of any worker on rope
All tools on lanyards and comms tested across work area?
Radio or visual signals confirmed working
All crew fit for duty — not fatigued, unwell or impaired?
Anyone not fit must be stood down before work starts
Site conditions within acceptable thresholds per SWMS?
Wind, swell, weather — all within pre-agreed limits
📝
Additional Notes / Actions Required
📋Select Job
Jobs are loaded from the job register. To add a new job, use the Jobs page.